Research this topic
Explore the main themes, entities and connections around London Array. Start with the topic map, then use the sections below for research and deeper semantic analysis.
Explore this topic
Start with a few of the strongest sections from the source topic. These are research directions, not a list of keywords you must use.
History
Description
Overview
Key facts & relationships
High-confidence facts extracted from structured source data. Use them as anchors for further research.
- Location
- 7 mi (11 km) off North Foreland, Kent
- Annual net output
- 2,500 GWh (2015)
- Capacity factor
- 45.3% (2015)
- Commission date
- October 2012
- Commons
- Related media on Commons
- Construction cost
- £1.8 billion
Topics to explore
A structured outline of related entities, concepts and subtopics. Open any item to build a new map centered on it.Browse the full topic structure. Each item opens a new analysis centered on that subject.
Overview
- Round 2 offshore wind farm Round 2 wind farm
- Kent
- Thames Estuary
- Walney Extension
- Prime Minister Prime Minister of the United Kingdom
- David Cameron
Description
- Wind farm
- North Foreland
- Kentish Knock Kentish Knock (England)
- Margate
- Clacton
- Fisherman's Gat
- Foulger's Gat Thames estuary
- Siemens Wind Power
- Monopile foundation
- Graveney
- Thanet Wind Farm
- CO2
History
- Department of Trade and Industry Department of Trade and Industry (United Kingdom)
- Crown Estate
- DONG Energy
- Abu Dhabi
- Masdar Abu Dhabi Future Energy Company
- E.ON UK Renewables E.ON UK
- European Investment Bank
- Ofgem
- Barclays
- Mitsubishi Corporation
- Caisse de dépôt et placement du Québec
- Schroders Greencoat Greencoat UK Wind
- Bilfinger Berger Ingenieurbau GmbH Bilfinger Berger Ingenieurbau GmbH?action=edit&redlink=1
- A2SEA
- TIV MPI Adventure
- Jack-up
- Nexans
- Capacity factor
- Levelised cost
- Royal Society for the Protection of Birds
- Red-throated divers Red-throated diver
Advanced semantic analysis
Deeper signals for content research, entity SEO and topical coverage. The plain-language headings explain what each technical view is useful for.
Map overview Semantic statistics
Number of nodes, edges, triples, density and central hubs. Use it to gauge the size and connectivity of the map.London Array
How this topic connects Entity context
Quick relationship hints grouped by predicate. Useful for spotting recurring semantic connections around the current entity.See the strongest relationship patterns around the current topic before diving into the raw triples.
London Array
Top relations
Important terminology Word statistics
Frequent words and multi-word phrases across the lead, headings, infobox and body. Useful for terminology coverage.Use these terms to understand the vocabulary surrounding the topic, not as a checklist for keyword stuffing.
Important terminology
wind offshore farm phase array kent mi london mw construction 20 masdar north uk installed siemens 630 kilometres 12 united
Entity relationships Subject–Predicate–Object triples
Extracted RDF-like relationships with confidence and source. The table includes structured facts and lower-confidence contextual relations.| Subject | Predicate | Object | Confidence | Src |
|---|---|---|---|---|
| London Array | Annual net output | 2,500 GWh (2015) | 1.00 | infobox |
| London Array | Capacity factor | 45.3% (2015) | 1.00 | infobox |
| London Array | Commission date | October 2012 | 1.00 | infobox |
| London Array | Commons | Related media on Commons | 1.00 | infobox |
| London Array | Construction cost | £1.8 billion | 1.00 | infobox |
| London Array | Coordinates | .mw-parser-output .geo-default,.mw-parser-output .geo-dms,.mw-parser-output .geo-dec{display:inline}.mw-parser-output .geo-nondefault,.mw-parser-output .geo-multi-punct,.mw-pars… | 1.00 | infobox |
| London Array | Country | United Kingdom | 1.00 | infobox |
| London Array | Distance from shore | 20 kilometres (12 mi) | 1.00 | infobox |
| London Array | Hub height | 87 metres (285 ft) | 1.00 | infobox |
| London Array | Location | 7 mi (11 km) off North Foreland, Kent | 1.00 | infobox |
| London Array | Make and model | Siemens Gamesa SWT-3.6-120 (175) | 1.00 | infobox |
| London Array | Max. water depth | 25 m (82 ft) | 1.00 | infobox |
| London Array | Nameplate capacity | 630 MW | 1.00 | infobox |
| London Array | Official name | London Array | 1.00 | infobox |
| London Array | Owners | E.ON UK | 1.00 | infobox |
| London Array | Owners | Greencoat UK Wind | 1.00 | infobox |
| London Array | Owners | La Caisse | 1.00 | infobox |
| London Array | Owners | Masdar | 1.00 | infobox |
| London Array | Rotor diameter | 120 metres (390 ft) | 1.00 | infobox |
| London Array | Site area | 122 km2 (47 sq mi) | 1.00 | infobox |
| London Array | Status | Operational | 1.00 | infobox |
| London Array | Type | Offshore | 1.00 | infobox |
| London Array | Units operational | 175 × 3.6 MW | 1.00 | infobox |
| London Array | Website | www.londonarray.com | 1.00 | infobox |
| London Array | is a | 175-turbine 630 MW Round 2 offshore wind farm located 20 kilometres | 0.90 | text |
Related concept clusters Concept neighborhoods
Clusters of nearby vocabulary surrounding the topic. Scan them for adjacent concepts and language you may have missed.These clusters group vocabulary that occurs around closely connected concepts in the source material.
Connections between topic areas Semantic bridges
Bridge nodes connect otherwise separate parts of the map. Expand a row to inspect the topic groups on each side.Bridges can reveal useful research angles that are easy to miss in a flat list of related terms.