Research this topic
Explore the main themes, entities and connections around STS-38. Start with the topic map, then use the sections below for research and deeper semantic analysis.
Explore this topic
Start with a few of the strongest sections from the source topic. These are research directions, not a list of keywords you must use.
Classified payload
Overview
Preparations and launch
Landing
Key facts & relationships
High-confidence facts extracted from structured source data. Use them as anchors for further research.
- Apogee altitude
- 269 km (167 mi)
- Contractor
- Rockwell International
- COSPAR ID
- 1990-097A
- Crew size
- 5
- Distance travelled
- 3,291,199 km (2,045,056 mi)
- Inclination
- 28.45°
Topics to explore
A structured outline of related entities, concepts and subtopics. Open any item to build a new map centered on it.Browse the full topic structure. Each item opens a new analysis centered on that subject.
Overview
- Space Shuttle
- NASA
- Space Shuttle Atlantis
- Classified Classified information in the United States
- U.S. Department of Defense United States Department of Defense
- Kennedy Space Center
- Shuttle Landing Facility
- Hydrogen leak Hydrogen leak testing
- Columbia Space Shuttle Columbia
- STS-35
- Orbiter Processing Facility
- EST Eastern Time Zone
- STS-51-D
Preparations and launch
- Liquid hydrogen
- Flight Readiness Review Design review (U.S. government)
Classified payload
- Aviation Week
- Inclination Orbital inclination
- Equator
- Orbital maneuvering system Space Shuttle Orbital Maneuvering System
- Rocket motor Rocket engine
- Geostationary transfer orbit
- ELINT Signals intelligence
- Geosynchronous orbit
- Gulf War
- Magnum satellite Magnum (satellite)
- STS-51-C
- STS-33
- Inertial Upper Stage
- Satellite Data System
- Military communications satellite Communications satellite
- STS-28
- STS-53
- Payload Assist Module
- Prowler Prowler (satellite)
Landing
Advanced semantic analysis
Deeper signals for content research, entity SEO and topical coverage. The plain-language headings explain what each technical view is useful for.
Map overview Semantic statistics
Number of nodes, edges, triples, density and central hubs. Use it to gauge the size and connectivity of the map.STS-38
How this topic connects Entity context
Quick relationship hints grouped by predicate. Useful for spotting recurring semantic connections around the current entity.See the strongest relationship patterns around the current topic before diving into the raw triples.
STS-38
Top relations
Important terminology Word statistics
Frequent words and multi-word phrases across the lead, headings, infobox and body. Useful for terminology coverage.Use these terms to understand the vocabulary surrounding the topic, not as a checklist for keyword stuffing.
Important terminology
atlantis launch mission space shuttle 1990 landing payload est kennedy orbit first classified november km mi sts-35 satellite 15 due
Entity relationships Subject–Predicate–Object triples
Extracted RDF-like relationships with confidence and source. The table includes structured facts and lower-confidence contextual relations.| Subject | Predicate | Object | Confidence | Src |
|---|---|---|---|---|
| STS-38 | Apogee altitude | 269 km (167 mi) | 1.00 | infobox |
| STS-38 | Contractor | Rockwell International | 1.00 | infobox |
| STS-38 | COSPAR ID | 1990-097A | 1.00 | infobox |
| STS-38 | Crew size | 5 | 1.00 | infobox |
| STS-38 | Distance travelled | 3,291,199 km (2,045,056 mi) | 1.00 | infobox |
| STS-38 | Inclination | 28.45° | 1.00 | infobox |
| STS-38 | Landing date | November 20, 1990, 21:42:46 (1990-11-20UTC21:42:47Z) UTC (4:42:46 pm EST) | 1.00 | infobox |
| STS-38 | Landing mass | 86,677 kg (191,090 lb) | 1.00 | infobox |
| STS-38 | Landing site | Kennedy, SLF Runway 33 | 1.00 | infobox |
| STS-38 | Launch date | November 15, 1990, 23:48:15 (1990-11-15UTC23:48:15Z) UTC (6:48:15 pm EST) | 1.00 | infobox |
| STS-38 | Launch mass | 2,055,639 kg (4,531,908 lb) | 1.00 | infobox |
| STS-38 | Launch site | Kennedy, LC-39A | 1.00 | infobox |
| STS-38 | Members | Richard O. Covey | 1.00 | infobox |
| STS-38 | Members | Frank L. Culbertson Jr. | 1.00 | infobox |
| STS-38 | Members | Carl J. Meade | 1.00 | infobox |
| STS-38 | Members | Robert C. Springer | 1.00 | infobox |
| STS-38 | Members | Charles D. Gemar | 1.00 | infobox |
| STS-38 | Mission duration | 4 days, 21 hours, 54 minutes, 31 seconds | 1.00 | infobox |
| STS-38 | Mission type | DoD satellite deployment | 1.00 | infobox |
| STS-38 | Names | Space Transportation System-38 | 1.00 | infobox |
| STS-38 | Operator | NASA | 1.00 | infobox |
| STS-38 | Orbits completed | 79 | 1.00 | infobox |
| STS-38 | Payload mass | (Classified) | 1.00 | infobox |
| STS-38 | Perigee altitude | 260 km (160 mi) | 1.00 | infobox |
| STS-38 | Period | 89.79 minutes | 1.00 | infobox |
| STS-38 | Reference system | Geocentric orbit | 1.00 | infobox |
| STS-38 | Regime | Low Earth orbit | 1.00 | infobox |
| STS-38 | SATCAT no. | 20935 | 1.00 | infobox |
| STS-38 | Spacecraft | Space Shuttle Atlantis | 1.00 | infobox |
Related concept clusters Concept neighborhoods
Clusters of nearby vocabulary surrounding the topic. Scan them for adjacent concepts and language you may have missed.These clusters group vocabulary that occurs around closely connected concepts in the source material.
Connections between topic areas Semantic bridges
Bridge nodes connect otherwise separate parts of the map. Expand a row to inspect the topic groups on each side.Bridges can reveal useful research angles that are easy to miss in a flat list of related terms.