Research any topic before you write.
Find related topics. | Discover entities. | See connections. | Build a topical map.
The Limón Dam, part of the Olmos Transandino Project, is a multi-purpose concrete-face rock-fill embankment dam on the Huancabamba River in northwestern Peru, located to the south of Guabal. The project helps produce 4,000 gigawatt-hours (14,000 TJ) of electricity per year and transfer water from the Cajamarca region west to Lambayeque, near Olmos for…
Characters, History, Culture & Art
Explore the main themes, entities and connections around Limón Dam. Start with the topic map, then use the sections below for research and deeper semantic analysis.
Start with a few of the strongest sections from the source topic. These are research directions, not a list of keywords you must use.
High-confidence facts extracted from structured source data. Use them as anchors for further research.
Browse the full topic structure. Each item opens a new analysis centered on that subject.
Deeper signals for content research, entity SEO and topical coverage. The plain-language headings explain what each technical view is useful for.
See the strongest relationship patterns around the current topic before diving into the raw triples.
Use these terms to understand the vocabulary surrounding the topic, not as a checklist for keyword stuffing.
olmos project dam river peru 000 water tunnel limón huancabamba acres construction irrigation ft embankment 14 reservoir hectares 12 mi
| Subject | Predicate | Object | Confidence | Src |
|---|---|---|---|---|
| Limón Dam | Active capacity | 300×10^6 m3 (240,000 acre⋅ft) | 1.00 | infobox |
| Limón Dam | Annual generation | 4,000 GWh (14,000 TJ) (est.) | 1.00 | infobox |
| Limón Dam | Construction began | 2006 | 1.00 | infobox |
| Limón Dam | Coordinates | .mw-parser-output .geo-default,.mw-parser-output .geo-dms,.mw-parser-output .geo-dec{display:inline}.mw-parser-output .geo-nondefault,.mw-parser-output .geo-multi-punct,.mw-pars… | 1.00 | infobox |
| Limón Dam | Country | Peru | 1.00 | infobox |
| Limón Dam | Creates | Limón | 1.00 | infobox |
| Limón Dam | Height | 43 m (141 ft) | 1.00 | infobox |
| Limón Dam | Impounds | Huancabamba River | 1.00 | infobox |
| Limón Dam | Installed capacity | 600 MW (800,000 hp) (max. planned) | 1.00 | infobox |
| Limón Dam | Length | 320 m (1,050 ft) | 1.00 | infobox |
| Limón Dam | Official name | Presa Limón Proyecto Especial Olmos Tinajones (PEOT) | 1.00 | infobox |
| Limón Dam | Opening date | 2009 | 1.00 | infobox |
| Limón Dam | Operator | Novonor | 1.00 | infobox |
| Limón Dam | Owner | PEOT - Regional Government of Lambayeque (GORE) | 1.00 | infobox |
| Limón Dam | Status | Operational | 1.00 | infobox |
| Limón Dam | Surface area | 275 ha (680 acres) | 1.00 | infobox |
| Limón Dam | Total capacity | 44×10^6 m3 (36,000 acre⋅ft) | 1.00 | infobox |
| Limón Dam | Type of dam | Embankment, concrete-face rock-fill | 1.00 | infobox |
| Limón Dam | is a | 43-metre | 0.90 | text |
These clusters group vocabulary that occurs around closely connected concepts in the source material.
Bridges can reveal useful research angles that are easy to miss in a flat list of related terms.